How to Install Shaker Screen for Shale Shaker?

As the most important part for shale shaker, shaker screen plays an important role for the whole shale shaker in solid control system. However, there is a problem about shaker screen’ installation; generally speaking, shaker screen is easy to be broken by the drilling solids, and then we should know how to install or exchange the shaker screen for the shake shaker or mud cleaner.

How to install shale shaker screens in drilling fields?

Firstly, we should stop the working equipment when we found the shaker screen has been broken by some solids.

Second, we should uninstall the shaker screen by our hands or some other tools. In some times, we should use water to cleaner the screens in drilling mud. Do not worry, we do not use mud cleaner to cleaner the mud, for our QJ mud cleaner is mainly used for separating the drilling mud and drilling sand from the drilling solids. In the onsite work, we should use centrifugal sand pump to transfer the drilling solids for the shale shaker or mud cleaner; in this program, maybe we will use shear pump to cut the drilling solids into small sizes so that they could be transported easily. After we taken the shaker screen from the equipment, we should use water to cleaner the equipment (such as linear motion shale shaker and mud cleaner), after that, we could be prepared to exchange and install the new shaker screen.

Third step is to install the new shaker screen on the equipment. In this step, there are two ways for installation. One is the traditional way, we should cleaner the equipment, and then put the shaker screen on the table / frame of shale shaker or mud cleaner, and then we should use screws to tight the shaker screen once again. General, there are 3 layer shaker screens should be installed on the frame of the equipment. So we should repeat the steps again and again.

HI-G shale shaker with ks steel shaker screen
HI-G shale shaker with ks steel shaker screen

While with the development of society and we have designed new frame for a convenient exchange and install the shaker screen. That is for our new Hi-G shale shaker. With the new design, we did not repeat that complex steps to put off the shaker screen and then install new ones on the frame of the equipment. Actually, we just even need one step and then we could install the new screens well, which could provide us a high working efficiency in oil drilling fields.

After the three steps, we could restart the equipment again to start the separating work. With the new screens, we could ensure you all that our shale shaker or mud cleaner could provide a higher working efficiency for your oil drilling separating work. Just like our new vertical cutting dryer for oil drilling waste management, and vacuum degasser for solid control system; they all could provide us a high working efficiency in oil drilling fields.

In 2015, we have developed new equipment called tricanter centrifuge, which is used for slurry oil recovery unit; while another one is called high frequency vibrating screens for mineral fields. Both items have won a popular appreciation from the overseas partners and end users. As the traditional solid control equipment manufacturer, we could provide you more and higher quality guaranteed equipment for oil drilling fields. Please feel free to contact us for more information about the details.

prev: next:
  • Blog List

  • General Instruction of We...
  • XBSY Centrifugal Sand Pum...
  • General Instruction for M...
  • WestPetro Will Attend Mos...
  • WestPetro Attend 2016 Bei...
  • What’s the Right Centri...
  • What’s the Necessar...
  • What the Equipment Will B...