How to Assemble Mud Cleaner in 3 Steps?

In our whole solid control equipment, mud cleaner plays a most important role in solid control system and oil drilling work. We will always use the QJ mud cleaner series to help us separate the drilling sand and drilling mud. Frankly, WestPetro mud cleaner could provide the functions of de-sander and de-silter. Therefore, this item has been popular used in different oil drilling fields in different countries.

Now that the mud cleaner is so important, so it’s most important for us to know how to use it in its max working efficiency. Of course, we should assemble it before we use it in our oil drilling fields.

How to assemble mud cleaner in 3 steps?

Step 1: please prepare the frame of shale shaker, which contains the Italy imported motor power, shaker screen in KS steel style. After these items have been prepared well, we should ask the engineers to start to assemble the KS steel shaker screen in the frame of shale shaker. After they finished this step, we could start the next step.

Step 2: please prepare the cyclones, which are commonly used in de-sander and de-silter, and the drilling sand or drilling mud will be come out from these parts. Generally speaking, the cyclones could be assembled on the top of the mud cleaner, or they could be prepared in a unit, and then assemble the whole unit on the top of the mud cleaner. Both could be prepared for you in WestPetro.

After we assembled the cyclones on the top of mud cleaner, we have almost finished the whole assemble work. And the last step is to test.

Step 3: we should test the mud cleaner’s working condition before they have been delivered to oil drilling fields or solid control system. Commonly, there will be designer engineers, electrical engineers, mechanical engineers in the test site, which is for solving some unexpected situations or problems in the whole testing work. Usually, the testing work will last for 2 hours.

Actually, except for mud cleaner, there are other solid control items will be accept the testing, such as horizontal vacuum degasser, vertical cutting dryer, WJQ shear pump, centrifugal sand pump series and decanter centrifuge series. Even if they will work for different working sites, but they still should accept the harsh test before they have been sent to the drilling field sites.

For more information about how to assemble mud cleaner and other related solid control items, please feel free to contact us, and we will provide full details information. Of course, we will share some useful topics about how to test solid control equipment later. Hope these information will do some good for your drilling work.

prev: next:
  • Blog List

  • General Instruction of We...
  • XBSY Centrifugal Sand Pum...
  • General Instruction for M...
  • WestPetro Will Attend Mos...
  • WestPetro Attend 2016 Bei...
  • What’s the Right Centri...
  • What’s the Necessar...
  • What the Equipment Will B...